Path construction achieved a significant milestone with the completion of the first phase of the project, the recycled rubber path and over-the-water walkway east of the Peach.

 

The contract tender to build the walkway required a two-phase construction timeline, with work suspended as of mid-June to ensure walkway and beach access would not be impacted during the busy summer months.

 

Project elements completed to date include:

  • Modified plaza of pavers around The Peach that shape the realigned walkway

  • Recycled rubber walkway through the existing trees

  • Concrete walkway over the water has been constructed and finished

  • The multi-use path has been built from the Peach to the crosswalk at the intersection of Lakeshore Drive and Churchill Avenue

  • The plan to maintain two-way traffic and angle parking has been realized

  • Existing large trees in the area were successfully preserved