For the Town of Osoyoos in 2011, Greyback completed this Design/Build project of docks & 32 boat slips at the Osoyoos Marina, including piling installation.

    Preliminary construction consisted of dredging the existing marina basin area, removal of 3500 m3 material (which was transported to the local landfill), construction of 280 m of concrete block perimeter wall and two boat launches using precast concrete pads. 

    Early in the dredging stage of the project, discovery of an endangered species of hibernating Western Painted Turtle halted work for awhile!

    http://www.osoyoostimes.com/news/2011/02/15/hibernating-turtle-halts-marina-construction/


    Back to Projects

    Join our team

    Greyback Construction Ltd. is continuously looking for talented candidates to join our team.

    We offer challenging and fulfilling work with various opportunities for individuals to build careers. Our employees are vital to our success.

    Apply Today